Modeling Scenario

Before we actually begin building a model, let's look at a fictitious scenario for our model building session.

Cogswell Cogs has just secured a contract to produce a new cog for production of the X-95C Family Space Cruiser. The current capacity of the Cogswell facility is not adequate to handle any additional work load while continuing to fill existing orders. Therefore, Mr. Cogswell has ordered the I.E. department to simulate the design of a new workcell dedicated to the production of the new cog.

The process consists of loading a cast blank onto an NC mill for milling of the outside splines. Once the splines have been cut, the cog must be degreased, inspected and loaded with an inner bearing. All operations, including inspection, are to be performed by a single operator.